For a concrete slab the size of an average two-car garage, the main floor only takes around 2 hours, but the edges of the surface require a smaller grinder and can take longer. Learn more here: Concrete Grinding Service Page
For a concrete slab the size of an average two-car garage, the main floor only takes around 2 hours, but the edges of the surface require a smaller grinder and can take longer. Learn more here: Concrete Grinding Service Page
Leave a Reply